Scope of project:
• Design Drawings.
• Shop Drawings.
• Supply & Installation
(Truss -Handrail -Tracks -Trench cover -Grating- Tanks
Steel Trusses MP
Client: Misr Petroleum.
Tonnage: 193 Ton
Location: Suez.

Project Constraints
Design Complexity : Creating efficient truss designs that balance load-bearing capacity, aesthetics, and structural stability requires expertise.
Fabrication Precision : Achieving accurate fabrication and assembly is crucial to ensure load distribution and safety.
Leak Prevention : Implementing effective seals and coatings to prevent leaks is critical.
Initial Challenges
Alignment and Smooth Operation : Installing tracks precisely to allow smooth movement of equipment or materials can be challenging.
Maintenance Accessibility : Designing tracks for easy inspection and maintenance poses a constraint.
Material Durability : Choosing durable materials that withstand wear and weather conditions is a challenge.
Solution
Expert Truss Design : Developed truss designs with an optimal balance of load-bearing capacity, aesthetics, and structural stability.
Accurate Fabrication : Ensured precise fabrication and assembly to meet load distribution requirements and maintain safety standards.
Leak Prevention : Applied effective seals and coatings to prevent leaks, enhancing durability and reliability.
Precise Track Installation : Installed tracks with high precision for smooth equipment movement, overcoming alignment challenges.
Maintenance Accessibility : Designed tracks for easy inspection and regular maintenance, ensuring long-term functionality.






