Scope of project:
• Design Drawings.
• Galvanize.
• Shop Drawings.
• Supply & Installation.

Client: (China State Construction Engineering) CSCEC.
Tonnage: 178 Ton
Location: The Administrative Capital.

Project Constraints

Environmental Conditions: Exposure to harsh weather, chemicals, or other environmental factors may necessitate additional protective coatings or material treatments to ensure the longevity of the trench covers.

Regulatory and Safety Standards: Compliance with local regulations and safety standards might impose additional design and installation requirements, affecting the project scope and constraints.

Cost Constraints: limited project budget affects the time available for design, procurement, and installation. The structure shall be designed carefully to stand on the budget limit without affecting the structure strength

Initial Challenges

Structural Weakness: Existing trench covers may have lacked the necessary
strength to support heavy loads, leading to potential safety hazards and structural failures

Solution

Optimized Design & Compliance : Engineered trench covers to meet regulatory and safety standards while ensuring cost-effective material selection.

Galvanization & Durability : Applied protective coatings to withstand harsh environmental conditions, preventing corrosion and extending lifespan.

Pre-Fabrication & Efficient Installation : Off-site manufacturing ensured quick delivery and minimized on-site work, reducing delays and costs.

Load-Bearing Enhancement : Strengthened design to support heavy loads, eliminating structural weaknesses and safety risks.